Tricky Story logoTricky Story
  • Home
  • All Levels
  • Download
  • Blog
Home/All Tricky Story Levels/Tricky Story Level 206
Tricky Story Level 206

Tricky Story Level 206 – Make Claire’s Dorm Bed Perfect

Help Claire set up her new dorm bed in Tricky Story Level 206 (Story 2)—find the full walkthrough and solution.

💡

Quick Answer for Tricky Story Level 206 (Do This)

In Tricky Story level 206, start by clicking the large scissors on the floor in the lower left corner to pick them up — that’s your first step toward the Tricky Story walkthrough!

Tricky Story Level 206 screenshot

Overview

Stuck on this challenge? This walkthrough breaks down every step so you can move on quickly.

Your objective: Help Claire set up her new dorm bed.

Welcome to Tricky Story Story 2 Level 56! Claire has completely fallen from grace and been demoted to the shabby留级生 dorm. She must transform the cold iron bed frame on the right into a warm sleeping nest. This level's core mechanism is multi-component gravity stacking counter mode (0/10). You need to use scissors on the ground, iron hammer, rolled mattress, pink suitcase bedding and various warm accessories to execute 10 successful bed assembly and decoration operations. Each correct placement will add "+1" to the progress bar. This guide will help you push the progress bar step by step to 10/10 for a cozy completion!

Step-by-Step Walkthrough

Here's the complete solution. Follow these 10 steps in order — each one is a concrete action you take on screen.

  1. Pick Up Large Scissors on Ground (Progress 1/10): Click the large scissors lying on the floor in the lower left corner and add them to your tool inventory.
  2. Cut Rope Binding Rolled Mattress (Progress 2/10): Drag the scissors to the thick rope tying the rolled mattress on the floor and cut it to release the mattress.
  3. Spread Mattress Flat on Right Iron Bed Frame (Progress 3/10): Drag the unrolled mattress and precisely spread it flat on the empty right iron bed frame to lay the foundation.
  4. Pick Up Iron Hammer on Floor (Progress 4/10): Click the black iron hammer lying next to the mattress and put it into your tool tray.
  5. Use Hammer to Knock Loose Bed Frame Screws (Progress 5/10): Drag the hammer to the loose screw joints of the right bed frame and knock 2-3 times to reinforce the bed structure. Progress bar successfully adds 1.
  6. Open Pink Suitcase in Lower Right Corner (Progress 6/10): Click the pink rolling suitcase in the lower right corner and pull open the zipper to reveal the bedding inside.
  7. Take Out Purple Quilt from Suitcase (Progress 7/10): Drag the purple quilt from the opened suitcase and spread it on the mattress just laid on the right bed.
  8. Take Out White Pillow from Suitcase (Progress 8/10): Drag the white fluffy pillow from the bottom layer of the pink suitcase and place it at the head of the right new bed.
  9. Place Pink Heart Throw Pillow (Progress 9/10): Take out a pink heart-shaped small throw pillow from the suitcase and throw it in the center of the purple new bed just made on the right.
  10. Complete Remaining 2 Decoration Accessories (Progress 10/10): Use multi-finger operation to click the red piggy bank on the back wooden table and the white Maltese dog on the lower left cotton mat. Move these life-atmosphere small companions to the right new bed's bedside table and quilt foot (progress bar fills to 10/10 full). The shabby iron bed instantly becomes quite warm. Claire sits on the bed with a somewhat moved expression for perfect clearance!

Pro Tips

Use these tips to make things easier — they cover the common traps and fastest route through.

  • Strictly follow "gravity stacking logic": This level's bed changing bedding has extremely binding sequential order in hard coding. You must first take scissors (Step 1) to untie the rolled mattress on the ground and spread it flat (Steps 2 & 3) before you can stack pillows and quilts from the suitcase on top (Steps 7 & 8). If you directly hug the pillow, it will keep erroring and bouncing back to the suitcase because the bed frame has no supporting volume.
  • Two-finger parallel operation flow: Picking scissors on ground (Step 1) and picking iron hammer on ground (Step 4) are all in the lower half of the screen. In the first second of opening, directly use left and right thumbs to work simultaneously to put them into the bottom tray. This can save 4 seconds of surplus in the 60-second hard time limit.

Still Stuck?

If the solution isn't matching what you see on screen, double-check the screenshot above to confirm you're on the right page, then follow the video walkthrough step by step. For other stages, browse the full Tricky Story walkthrough directory.

← Level 205Level 207 →

Share this walkthrough

Share:

Related Tricky Story Levels

Tricky Story Level 202 screenshot#202
#202
Tricky Story Level 203 screenshot#203
#203
Tricky Story Level 204 screenshot#204
#204
Tricky Story Level 205 screenshot#205
#205
Tricky Story Level 207 screenshot#207
#207
Tricky Story Level 208 screenshot#208
#208
Tricky Story Level 209 screenshot#209
#209
Tricky Story Level 210 screenshot#210
#210
← Tricky Story Level 205Tricky Story Level 207 →
Browse all levels →
Tricky Story logoTricky Story

Full level walkthroughs, answers, and solutions for every Tricky Story level.

Puzzles
  • All Levels
  • Download Game
  • Blog
Company
  • About Us
  • Contact
Legal
  • Privacy Policy
  • Terms of Service
  • Cookie Policy
© 2026 Tricky Story. All Rights Reserved.
Sponsored